Electrical Engineering License Exam Preparation (AElE)

Prepare for the NEC Electrical Engineering (AElE) license exam: Electrical Machines, Power Plants, Protection, Transmission and Power System Analysis, chapter by chapter, with thousands of practice MCQs and mock tests. Free.

Electrical Engineering syllabus (AElE)

  1. Fundamental of Electrical Engineering

    • Basic circuit concept
    • Network theorems
    • Alternating current fundamentals
    • Electric circuit responses
    • AC series and parallel circuits
    • Three phase systems
  2. Electrical Machines

    • Magnetic circuits
    • Transformers
    • DC machines
    • Synchronous machines
    • Three phase induction motors
    • Single phase induction motor
  3. Power Plants Engineering

    • Hydroelectric power plants
    • Diesel electric power plants
    • Non-conventional power generation
    • Energy storages
    • Excitation systems
    • Starting of generators
  4. Electrical Measurements and Instrumentations

    • Measurement and error
    • Measuring instruments
    • Transducers and sensors
    • Analog to digital and digital to analog converters
    • Digital instrumentation
    • Instrument transformers
  5. Power Electronics and Control

    • Control system fundamentals
    • Time domain analysis
    • Frequency domain analysis
    • Power semiconductor switches
    • Power converters
    • Applications of power electronics
  6. Power System Protection

    • Fuses, isolators and reactors
    • Circuit breakers
    • Protective relays
    • Lightning protection
    • Earthing
    • Substations
  7. Transmission and Distribution Lines

    • Transmission lines
    • Transmission lines circuit selection
    • Mechanical design of overhead line
    • Electrical loads
    • Distribution systems
    • Voltage regulation and power factor correction
  8. Utilization of Electrical Energy

    • Illumination
    • Electrical design and estimation
    • Tariff schemes
    • Electric drives and motor selection
    • Electric heating
    • Electric traction
  9. Power System Analysis

    • Transmission line parameters
    • Performance of transmission line
    • Fault calculations
    • Load flow
    • Stability analysis
    • Voltage control and VAR compensation
  10. Project Planning, Design and Implementation

    • Engineering drawings and its concepts
    • Engineering Economics
    • Project planning and scheduling
    • Project management
    • Engineering professional practice
    • Engineering Regulatory Body

Sample Electrical Engineering questions

Full-load compensation to a transmission line requires

  1. Shunt capacitors
  2. Series capacitors
  3. Transformers
  4. Shunt reactors

Which of the following is not an advantage of hydroelectric power plant?

  1. no standby losses
  2. no fuel requirement
  3. continuous power source
  4. low running cost

The Incandescent light bulbs of 40 W and 60 W ratings are connected in series across the mains. Then

  1. The bulbs together consume 100 W
  2. The bulbs together consume 50 W
  3. The 60 W bulb glows brighter
  4. The 40 W bulb glows brighter